Debris prevents robots from entering stricken nuclear plant
- 31 March, 2011 22:47
- Comments
Tokyo Electric Power is looking to send radiation-hardened robots into the wrecked Fukushima Daiichi nuclear power plant, but obstacles literally stand in the way of their use.
The company has already been provided a nuclear safety robot by Japan's Nuclear Safety Technology Center and the U.S. Dept. of Energy said this week that it would send at least one robot to Japan, but the large amount of debris and cables littering the Fukushima plant poses problems for their use.
The Japanese robot, called "Moni Robo A," remains at the operations staging area because of the state of the plant, said Hiro Hasegawa, a spokesman for Tokyo Electric Power (TEPCO). A tsunami washed a large amount of debris across the plant and more was spread when hydrogen explosions blew the tops off two reactors buildings.
"If the problem is cleared in the future, we will try to use it," he said.
Moni Robo A runs on caterpillar tracks and is 1.5 meters tall. It has radiation and gas sensors, front and rear cameras, a GPS (Global Positioning System) unit, and a 3D camera at the top. There's also a hinged manipulator arm that can reach out around the robot.
It can be remotely operated from a portable control room that was designed to fit inside a C-130 cargo aircraft for rapid deployment. The control center can remain in a safe area and communicate with the robot via radio. Repeater stations can extend the range of the radio link if required.
Robots are also on their way from the U.S., according to testimony provided to the Senate Energy and Natural Resources Committee in Washington, D.C., this week.
"The Department [of Energy] has provided information to the Government of Japan on radiation-hardened robotic capabilities available within [the U.S.], a shipment is being readied," said Peter Lyons, acting assistant energy secretary for nuclear energy.
"We are moving expeditiously to ship not only the robots, but also operators who perhaps will be used to train Japanese operators," he said.
The U.S. is already flying a drone over the Fukushima Daiichi plant to collect data and provide video of the plant. The Global Hawk aircraft, developed by Northrop Grumman, is known for its use above Iraq and Afghanistan, but it is being employed above Fukushima for the same reasons it's used elsewhere: because it's autonomous there is no risk to a pilot.
Some have expressed surprise that robots were not put into use at the plant earlier. Numerous robots have been developed in the country, but most are focused on industrial use in factories or as home-help devices for the elderly.
Martyn Williams covers Japan and general technology breaking news for The IDG News Service. Follow Martyn on Twitter at @martyn_williams. Martyn's e-mail address is martyn_williams@idg.com
Join the CIO Australia group on LinkedIn. The group is open to CIOs, IT Directors, COOs, CTOs and senior IT managers.
- Bookmark this page
- Share this article
- Got more on this story? Email CIO
- Follow CIO on twitter
- Optimised Data Protection for VMware® Environments with Symantec NetBackup™ Appliances
- Reconciling Datacenter consolidation and security: It starts with an integrated approach
- Aberdeen Group Analyst Insight Report: Does Your Enterprise Have a “Dropbox Problem?”
- Lower Your IT Costs When You Standardize on Oracle Database 11g
- Becoming a Social Business
-
Google Jumps Into Social Bookmarks Game
-
NBN build gaining momentum daily: Quigley
-
Face Time - Interview with John Brennan and Robert DiStefano
-
Monday Grok: Will Siri crack the walls of GOOG?
-
Face Time - Interview with John Brennan and Robert DiStefano
-
Get the Whole Picture Why Most Organizations Miss User Response Monitoring—and What to Do About It
You can be armed with vast amounts of performance metrics, but if you don’t know what users are actually experiencing, you don’t have the real performance picture. While this measure is critical, it is one many organizations fail to consistently capture. This guide looks at the challenges of user response monitoring, and it shows how you can overcome these challenges and start to get a real handle on your infrastructure performance and how it impacts your users’ experience. -
A Technical Overview of the Oracle Exadata Database Machine and Exadata Storage Server
Businesses today increasingly need to leverage a unified database platform to enable the deployment and consolidation of all applications onto one common infrastructure. Whether OLTP, DW or mixed workload a common infrastructure delivers the efficiencies and reusability the datacenter needs – and provides the reality of grid computing in-house. Read on. -
The Need for DLP (data leak prevention) now
When it comes to the terabytes of confidential and proprietary data on corporate networks, companies often use kid gloves to secure the data. This begs the question, why are office supplies subject to a higher level of security than the data? Many organisations are turning to a DLP solution to help them in gaining control over their seemingly uncontrolled data stores.
-
Dreamweaver MX 2004 Complete Course
-
Apache, MySQL, and PHP Web Development All-In-One Desk Reference for Dummies
-
Mastering Red Hat Enterprise Linux 3
-
Creating and Capturing Value
-
Professional ASP.NET 2.0 Special Edition
-
Microsoft Official Academic Course
-
QuickBooks 2008 All-In-One Desk Reference for Dummies®
-
Windows XP All-In-One Desk Reference for Dummies, 2nd Edition
-
Managing Your Business with Outlook 2003 for Dummies








Comments
Post new comment